Contact Us | SmartPower Logistics

SmartPower Logistics

Talk to us about SmartPower and project logistics

Moving heavy power equipment, or keeping a running plant on its availability target? Tell us which, and the right engineer will reply.

Two ways we can help

Some visitors come to us with a turbine or transformer that has to cross a border and land on a plinth on time. Others run a plant and want SmartPower monitoring and CMMS discipline behind their operations team. USP&E handles both, and USP&E can do both.

If you still need the equipment itself, search the USP&E inventory.

Get in touch

Details that speed up a logistics or SmartPower enquiry

  • For a move: equipment type, weight, dimensions and origin port.
  • The destination site and its road, crane and laydown constraints.
  • For SmartPower: the plant type, unit count and any CMMS already in use.
  • Customs, insurance or permit steps you have already started.
  • The date the equipment must be on site, or the date monitoring must be live.

Useful reading before you write

Our offices

USP&E works from six offices in the USA, the UK, South Africa and China, and is certified to ISO 9001 and ISO 45001.

Colorado Springs

1755 Telstar Dr, Suite 300, Colorado Springs, USA

Knoxville

800 S Gay St, Suite 700, Knoxville, USA

London

162-168 Regent Street, London, UK

Johannesburg

22 Kildoon Rd, Bryanston, South Africa

Cape Town

31 Brickfield Road, Woodstock, South Africa

China

No. 1 Ningzhou Road, Wuxi, China

Certified and accountable

Logistics and operations fail at the hand-offs. USP&E keeps engineering, shipping, commissioning and operation under one roof, with ISO 9001 and ISO 45001 systems behind each step.

ISO9001 & 45001 certified
400+Engineers & project managers
35+Countries with completed utility-scale projects

Facing a power challenge on site?

Call +27 10 822 2324 or email info@uspeglobal.com and describe the move or the plant.

Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · SmartPower Logistics is part of USP&E