These films show the systems and teams behind SmartPower Logistics.
See the Systems and Teams
We publish films so you can see how we operate before you sign. USP&E’s videos cover our monitoring platform, our field services and our equipment. USP&E is a full-service EPC and O&M contractor, not a broker.
What the Films Show
The SmartPower film explains how plant data is collected and turned into dashboards and alerts for O&M teams. The O&M and EPC films show how crews, spares and equipment come together on site, and the inventory film explains how equipment is sourced before it is shipped.
Together they show the full chain: equipment sourced, moved, installed, monitored and maintained by one company.
Watch the Films
Using the Films in Your Decision
Share the films with operations, procurement and finance colleagues so everyone understands how logistics and monitoring support uptime. Then bring your site details to a call and we will map the process onto your project.
For specific delivery work, our teams handle mobilising generators into Africa and shipping mobile gas turbines.
USP&E Offices Behind the Films
Johannesburg (22 Kildoon Rd, Bryanston), our Executive HQ, and Cape Town (31 Brickfield Road, Woodstock) lead African work on the logistics and O&M work in our films, from first site visit to handover. After watching, ask our Johannesburg team how SmartPower and logistics support would work for your plant. Knoxville (800 S Gay St, Suite 700) and Colorado Springs (1755 Telstar Dr, Suite 300) support US inspection and engineering, London (162-168 Regent Street) helps with structuring and finance, and Wuxi (No. 1, Ningzhou Road, Wuxi) covers China supply chain. USA | AFRICA | UK | UAE | CHINA. Behind that footprint sit 150+ power projects in 45+ countries, 25,000 MW contracted since 2002, and ISO 9001 and ISO 45001 certified management systems.
Projects Supported by Our Teams
You want proof behind the footage. These projects are on record.
- USP&E supplied 28 Cummins KTA50 containerised diesel gensets, 1,275 kVA each, for Perseus Mining’s Nyanzaga Gold Project in Tanzania.
- Barrick Gold, Mali: USP&E refurbished and supported a 104 MW mining power station. Read the case study.
- NEOM, Saudi Arabia: USP&E supplied three zero-hour Siemens SGT-400 gas turbines. Read the case study.
After You Watch
Your 3-step plan: 1. Watch the SmartPower and O&M films. 2. Share them with your team. 3. Book a call to plan logistics and monitoring for your site.
- Watch the SmartPower film.
- Watch the O&M and EPC films.
- Share with operations and procurement.
- List your site and equipment details.
- Book a planning call.
Resources
EPC · O&M · About USP&E · Case studies · Contact · Inventory · O&M and SmartPower.
FAQ: SmartPower and power plant videos
Which film explains SmartPower?
USP&E’s SmartPower film explains how plant data is collected and turned into dashboards, alerts and maintenance actions for O&M teams. It is the best starting point if monitoring is your main interest.
Do the films cover logistics?
USP&E’s EPC and O&M films show how equipment, crews and spares come together on site. Detailed logistics plans for your project, such as routes and lift plans, are prepared during scoping.
Can I share the videos?
Yes. USP&E publishes the films on its official YouTube channel so you can share them with colleagues in operations, procurement and finance before a first meeting.
Is USP&E a logistics broker?
No. USP&E is a full-service EPC and O&M contractor, not a broker. Logistics and monitoring are part of how we deliver and run power plants, and we remain accountable for the outcome.
How do I contact USP&E after watching?
USP&E can be reached through the contact page or on +27 10 822 2324, with teams in Johannesburg, Cape Town, Colorado Springs, Knoxville, London and Wuxi responding by project location.
Take the Next Step With USP&E
Done well, the logistics and O&M work in our films turns into steady output and clean records. Done badly, it becomes a stranded asset and a dispute. Call USP&E on +27 10 822 2324, email info@uspeglobal.com or use the contact page; stock is listed on the inventory hub.
Powering Possibility. Built for the Frontier.
